Timebridge Community Centre, Croydon
Langley Design collaborated with McAvoy on the new 161,000m2 Timebridge Community Centre in Croydon. This state of the art centre is pivotal in allowing people from surrounding areas to access to education, health, career and social support. Providing day-to-day services such as nursery provision and a food bank, whilst offering multi-function space to socialise and ask for advice or support.
Langley Design were chosen to supply and install a wide range of street furniture, from our Malford Cycle Shelter MCS204 providing protection for 20 bicycles from the external elements, to our sleek and modern Langley LBN107 Bench, and finally down to those smaller but vital items such as our Malford Door Barrier MBD203 often required to finish a project off. All of these were powder coated to the same RAL colour ensuring uniformity and a cohesive look across the whole site. We even had the necessities covered with our Sheldon Bin Store SBS303, manufactured in class 4 treated redwood, our practical yet appealing design ensured the beautiful aesthetics of this project were maintained and unsightly waste remained hidden from view. As a bespoke manufacture Langley Design are able of offer our products in a variety of shapes and sizes to cater for almost every projects specific requirements.
Download Project Case StudyProject Reference: LDINV2508
Contractor: The McAvoy Group
Job Type: Supply & Install
Malford Cycle Shelter MCS204
Langley Bench LBN107
Sheldon Bollards SBD300
Sheldon Bin Store
Malford Door Barrier MDB203