Suthers School, Nottingham
Langley Design were delighted to be chosen to work with Bowmer and Kirkland on another Education project. Langley Design’s extensive experience within the education environment saw two bespoke canopies produced from our Sheldon Range. Using our own canopy system we were able to manufacture an impressive 25m unit, with the leg layout specifically made to avoid clashes with the windows and doors. A smaller canopy from the same range was then produced to offer an entrance canopy to the school. The canopies offer so many benefits and provide extended teaching areas whilst also offering students shelter from the elements. Manufactured from PEFC sustainably sourced Treated Class 4 Redwood and installed by our skilled site teams.
Download Project Case StudyProject Reference: LDINV2315
Contractor: Bowmer & Kirkland
Job Type: Supply & Install