Lea & Garsdon CE Primary School, Wiltshire
Langley Design were delighted to again work with Rigg Construction on a project local to us in the village of Lea & Garsdon in Wiltshire. The existing Primary School received a new KS1 building providing a new hall, three new classrooms & SENco room, and a state-of-the-art commercial kitchen.
We were engaged to provide a cost-effective solution for the school’s canopy requirements. Utilising our Sheldon timber canopy system, we provided three large SCP307’s to the school’s external areas. The first of these provided a covered walkway from the existing school buildings to the new extension block, with the other canopies providing shelter to the external areas adjacent to the new classrooms, allowing the children to use this additional space whatever the weather. Manufactured in our budget friendly standard Treated Class 4 Redwood timbers and with long-lasting durable galvanised steel posts the canopies were finished with a powder coated guttering to match that of the main building. Available in a range of standard sizes, but adaptable to achieve bespoke dimensions and heights if required, our Sheldon Canopies are available in various timbers and with a range of roofing options, meaning we can find a solution to your project requirements.
Langley offer both supply only and supply & installation services throughout the UK, with a fully qualified and experienced site team available and our projects and technical team only a phone call away. If you have a specific requirement for your upcoming project, please contact us to discuss how we can help.
Download Project Case StudyProject Reference: LDINV2791
Contractor: Rigg Construction
Job Type: Supply & Install
Sheldon Canopy SCP307