Glan Usk Primary School

Glan Usk Primary School
  • SBN307 Sheldon Bench 10

    SBN307 Sheldon Bench 10
  • SCS301NS Sheldon Cycle Shelter GlanUsk 1

    SCS301NS Sheldon Cycle Shelter GlanUsk 1
  • SBN310 Sheldon Bench GlanUsk 2

    SBN310 Sheldon Bench GlanUsk 2
  • SCS301NS Sheldon Cycle Shelter GlanUsk 2

    SCS301NS Sheldon Cycle Shelter GlanUsk 2
  • MVS201 Malford Shelter GlanUsk 2

    MVS201 Malford Shelter GlanUsk 2
  • MVS201 Malford Shelter GlanUsk 1

    MVS201 Malford Shelter GlanUsk 1
  • MVS200 Malford Shelter GlanUsk 1

    MVS200 Malford Shelter GlanUsk 1
  • SBN307 Sheldon Bench 9

    SBN307 Sheldon Bench 9
  • SBN307 Sheldon Bench 8

    SBN307 Sheldon Bench 8
  • SBN310 Glan Usk Primaty 01

    SBN310 Glan Usk Primaty 01

Glan Usk Primary School, Newport


On the banks of the river Usk, this new build primary school had architect designed canopies in galvanised steel, we produced the structural calculations for their design intent. A large Sheldon cycle shelter combining staff (SNR) and pupil (JNR) sheffield style cycle hoops. In a number of instances the benching on site followed the curved lines required of the build. The Sheldon SBN307, in standard and reception heights was ideal for providing curved street furniture for a large number of school pupils.

Download Project Case Study

Project Reference: LDINV1289

Contractor: Vinci (Norwest Holst)

Job Type: Supply and Install

Sheldon Benches SBN310

Sheldon Bench Meters SBN307

Malford Cycle Hoops MCR200

Sheldon Cycle Shelter Bays SCS301 NS

Malford Viewing Shelter MVS200

Malford Viewing Shelter MVS201

More Projects

More Education Projects

More Education Projects

Take a look at other projects we have completed in the Education sector.

More Vinci Projects

More Vinci Projects

Browse other projects we have worked on with Vinci.

Project Location