Buckton Fields Primary School, Northampton
Langley Design worked with Caledonian Modular on the new Buckton Fields Primary School in Northampton which opened it’s doors in September 2021. We manufactured and installed our popular Malford steel canopy along with a smaller entrance canopy to the front of the school. These are not only aesthetically pleasing but can also be used for outdoor teaching, external dining, socialising or simply a sheltered area for pupils to congregate in adverse weather conditions. The canopies were powder coated to RAL5003 to match the schools blue colour scheme. We also installed a number of Malford steel cycle shelters to provide cycle parking facilities for the pupils which will protect their bicycles from the elements. These were also powder coated to tie in with the features of the new building.
Download Project Case StudyProject Reference: LDINV2610
Contractor: Caledonian Modular
Job Type: Supply & Install
Malford Cycle Shelter MCS206
Malford Cycle Rack MCR201
Malford Canopy MCP208
Malford Door Barriers MDB203